In Sept. 2013 Gerry was hired by the main insurance carrier as a Consulting Engineer for the fire investigation resulting from the 25 hour fire-fight at a refrigerated warehouse in south Jersey. The rooftop of that facility had a 1.5MW solar pv array.
In 2019 Gerry was hired to investigate an accident involving an ambulance liftgate.
Ongoing: We perform electrical forensics studies and have been called to consult for a variety of electrical fires.